Pages

Monday, 18 March 2024

London Bus Tender Awards: Electric Buses For Routes 98/N98, 188, 355 & 360

The London Bus Tender Awards have revealed that routes 98/N98, 188, 355 and 360 will be using new zero-emission electric buses.

18th March 2024

LBSL intends to enter into new contracts for the following routes with the operators listed below:

Route 6 (24h)
Retained by: Metroline
Peak Vehicle Requirement (PVR): 18
Type of vehicles: Existing hybrid double deck
Contract Start Date: 7th December 2024
Contract End Date: 3rd December 2027

Route 98/N98
Retained by: Metroline
PVR: 22
Type of vehicles: New electric double deck*
Contract Start Date: 7th December 2024
Contract End Date: 5th December 2031

Route 188 (24h)
Retained by: Go-Ahead London Central
PVR: 22
Type of vehicles: New electric double deck
Contract Start Date: 9th November 2024
Contract End Date: 7th November 2031

Route 355
Retained by: Go-Ahead London Central/London General
PVR: 13
Type of vehicles: New electric single deck
Contract Start Date: 7th December 2024
Contract End Date: 5th December 2031

Route 360
Retained by: Go-Ahead London Central
PVR: 11
Type of vehicles: New electric single deck
Contract Start Date: 7th December 2024
Contract End Date: 5th December 2031

* Route N98 will be operated by existing hybrids until further notice.

New electric vehicles may enter service after the contract start date, dependent on infrastructure and/ or vehicle delivery timescales.

The hybrid vehicles detailed above will meet Euro VI emissions standards.

I'm posting this article on my smartphone because I'm in another country away from my computer. Due to limitations, I won't be able to post a round-up of my tweets on Twitter or X.

I invite you to follow me on Twitter/X by searching for @CLondoner92 or by clicking on the direct link to my Twitter/X page here. I'm also on BlueSky and Mastodon.