I
would like to give you all a quick report regarding the delays I’ve seen
recently.
It's
late in the morning on 30th March 2016 and I'm
looking at Real Time Trains
and Open Train Times
(diagram map) of the 0953 service from Romford to London Liverpool Street
station. The service is a fast train which runs alongside the Shenfield Metro
which is branded as TFL Rail. I should point out that TFL
Rail is
operated by MTR Crossrail.
The
service I'm monitoring is 2K43, operated by Abellio Greater Anglia. I was expecting the 0953 service to London
Liverpool Street [LST] from Romford Station [RMF], but instead a freight train
(Duty code 488V) went past Romford Station at 0952¼ which is three minutes
behind their schedule. Then shortly afterwards the expected 0953 train arrives
at 0954¾ and departed at 0955¾ making it two minutes late.